嗨,我们得到一个简单的PC报告的100的副本(一个内置报告的克隆)。似乎在周日上午时间改变后,带时间表的报告似乎比他们应该触发的时间早了一个小时。所以它们就会一遍又一遍地重复,直到时间真正触发。
例如:
每日报告安排在早上7点,运行在早上6点(重复和超过- 718次上次计数)直到早上7点(它运行了一点,例如。7:05am,我想这只是赶上了que)。
我已经删除了报告,创建了全新的报告,设置了新的时间表,在PC CVM上检查了时间(是正确的)。尝试重新启动服务/集群停止/重新启动等。甚至尝试将PC升级到2021.1.0.1(这修复了我们的PDF报告问题,但不是这个)。
还有人有这个问题吗?
最佳答案alona.
I found some internal information on this and you have done everything right and beyond it. You have re-created the schedule and even the report. I\u2019ll include the steps below just in case. But if you think you have done all that and it still doesn\u2019t work could you please open a case with Nutanix Support?<\/p>
Remove the schedule<\/span><\/p> Edit the report.<\/span><\/p>\t<\/li>\t In the upper left corner click \u2018Edit Schedule\u2019.\u00a0<\/span><\/p>\t<\/li>\t At the bottom of the popup click the option to remove the schedule.<\/span><\/p>\t<\/li>\t Save the Report Config. This will stop the report generation from continuing.<\/span><\/p>\t<\/li><\/ol> \u00a0<\/p> Set up a Schedule with Playbooks<\/span><\/p> Go to Operations > Playbooks from the hamburger menu.<\/span><\/p>\t<\/li>\t Select Create Playbook.<\/span><\/p>\t<\/li>\t You must first set a trigger - in this case, set a Time Trigger.<\/span><\/p>\t<\/li>\t From the time trigger customization screen - change the radio button to configure a schedule at a recurring interval.<\/span><\/p>\t<\/li>\t Fill in the rest of the details to match the desired schedule frequency.<\/span><\/p>\t<\/li>\t Now you need to add the actions. Click Add action on the left-hand side.<\/span><\/p>\t<\/li>\t Search for Generate Report and click the Select button to add the Generate report action<\/span><\/p>\t<\/li>\t Choose the report config you would like to configure the schedule for and fill out any of the details you would like for how this report is generated.<\/span><\/p>\t<\/li>\t Now add one more action and search for the Email action.<\/span><\/p>\t<\/li>\t Fill in the details of the email action and be sure to add the report into the attachment field (click the dropdown and you should see the option to add it).<\/span><\/p>\t<\/li>\t Hit save and close. Be sure to click the enabled toggle to enable the Playbook.<\/span><\/p>\t<\/li><\/ol>